A carpenter levelling a run of new base cabinets in a Toronto kitchen, before the countertops are templated.

Kitchen renovation near you

Kitchen renovations, cabinet refacing and layout changes across the GTA. What drives the price, and where the countertop gap falls.

Need kitchen renovation?

Where do you need it?

Pick your city — quotes are local.

Services

Kinds of kitchen renovation

The kitchen renovation jobs people book most. Open one to see what it covers and what it costs.

Only on Taskly

One post, the whole situation handled

Several jobs bought as one outcome — one Tasker, one price to agree, no coordinating three trades yourself.

No reviews yet

After you post, here’s exactly what happens

  1. 1Offers arriveEach one carries a price and an approach, from verified Taskers only.
  2. 2Ask before you chooseEquipment, timing, whether they’ve worked in a building like yours.
  3. 3Accept oneYour payment is held by Taskly. Nothing is paid out yet.
  4. 4Confirm when it’s doneThe money releases and your receipt arrives by email.

Browse tasks by city

View all cities

Questions

Frequently asked

GTA-specific answers to what people actually search for.

How Taskly works, in full

How much does a kitchen renovation cost in Toronto?

This page shows no band, deliberately. Our pricing engine has rows for cleaning, moving, junk removal, lawn care, plumbing and electrical work, and a kitchen renovation is not among them — so rather than type a range nobody can derive from anything, we show none and let the fixed-price offers you receive be the number.

Is refacing worth it, or should I replace the cabinets?

If the layout works and the boxes are solid, refacing gives most of the visible change for a fraction of the cost and takes about a week rather than a month. Replacement makes sense when the layout is wrong, the boxes are damaged or swollen, or you are moving plumbing anyway and the cabinets have to come out regardless.

How long will I be without a kitchen?

A refacing job is usually about a week. A full renovation is more often four to six weeks of working time, and the countertop gap sits in the middle of it — stone is templated after the cabinets are in, then fabricated off-site, which leaves you with cabinets and no sink for one to two weeks. Ask for the schedule as a sequence, not a single end date.

Can I move the sink to an island?

In a house, usually yes — it means running drain and supply through the floor, which is a real cost but a normal one. In a condo, frequently no: many corporations prohibit relocating plumbing outright. Establish that with the building before you pay anyone to design around it.

Will a new range need electrical work?

An induction or electric range often does, and in older Toronto housing the question is whether the panel can carry it at all. Plenty of stock still has sixty-amp service, which a modern kitchen can exceed once you add a dishwasher, a microwave circuit and lighting. It is worth having the panel looked at before the appliance is chosen, not after.

Free to post

Ready to get it done?

Describe the job and compare fixed-price offers from verified kitchen renovation Taskers across the GTA. You only pay when it’s finished.