
Bathroom renovation near you
Bathroom renovations, tub-to-shower conversions and refreshes across the GTA. What drives the price, and which parts need a licensed trade.
Need bathroom renovation?
Where do you need it?
Pick your city — quotes are local.
The standard
Every bathroom renovation Tasker clears this first
We don’t show star ratings until real customers have reviewed real jobs. What’s true today is the standard everyone met to get here — so that’s what we show.
- ID verifiedGovernment ID checked before anyone can make an offer.
- Phone verifiedA one-time code, so the number on the offer is a real one.
- InterviewedA call with our team. Every Tasker, no exceptions.
- A real photoA person — not a logo, not a stock image.
- Payment heldReleased only when you say the work is done.
Services
Kinds of bathroom renovation
The bathroom renovation jobs people book most. Open one to see what it covers and what it costs.
Only on Taskly
One post, the whole situation handled
Several jobs bought as one outcome — one Tasker, one price to agree, no coordinating three trades yourself.
The one-bathroom house
Sequenced so the household is never without a working washroom for more than a planned window — with the demolition, the trade work and the finishing booked as one block rather than three waits.
Post this taskBefore the tenant moves in
A bathroom refresh and a full clean timed to the turnover date, so the unit is photographed and listed the same week rather than a month later.
Post this taskOpen the wall once
The renovation with the old galvanised supply and any exposed stack replaced while the wall is already open — the cheapest time it will ever be done.
Post this taskAccessible conversion
A curbless shower, blocking in the walls for grab bars, a comfort-height toilet and lever taps, planned together rather than retrofitted one at a time.
Post this taskMore on Taskly
Other things people post
Not what you came for? These are jobs Taskers pick up across the GTA — one post gets you offers on any of them.

A week of dinners, cooked
A cook fills the fridge for the week — your list, your dietary needs, containers labelled.
Post this task
Before the first snow
Gutters cleared, hoses drained and the walk ready, so December is not the first time anyone looks.
Post this task
Two people and a van
The couch, the bed frame and the eleven boxes — lifted, moved and set down where they go.
Post this task
Back on top of math
A weekly hour on the topics that slipped, worked through at the kitchen table or over video.
Post this taskNo reviews yet
After you post, here’s exactly what happens
- 1Offers arriveEach one carries a price and an approach, from verified Taskers only.
- 2Ask before you chooseEquipment, timing, whether they’ve worked in a building like yours.
- 3Accept oneYour payment is held by Taskly. Nothing is paid out yet.
- 4Confirm when it’s doneThe money releases and your receipt arrives by email.
Local knowledge
Priced for how the GTA actually lives
Four things that change a bathroom renovation quote here, and nowhere else.
Condo rules
The building decides your schedule
A GTA condo renovation runs on the corporation's terms: approved working hours, a booked service lift, and often sign-off on any plumbing change. None of that appears in a quote written for a house.
Old stock
Cast iron and galvanised turn up
Open a wall in an older east-end semi or an Annex Victorian and you frequently find a cast-iron stack or galvanised supply. Replacing it while the wall is open costs a fraction of doing it later.
Licensed work
Part of this job is not the renovator's to do
In Ontario, altering drains or supply and adding circuits are licensed trades. A renovator can tile, fit and finish; ask which parts are being subbed and to whom before you compare two numbers.
The floor below
Moving a drain means opening someone's ceiling
In a two-storey house or a stacked unit the bathroom floor is the ceiling underneath. Keeping fixtures where they are avoids that entirely, which is why layout — not finishes — sets the price.
What a full renovation usually covers
- Demolition and removal of the old fixtures, tile and vanity
- Any framing changes, and blocking where fixtures or grab bars will mount
- Plumbing and electrical rough-in, by the licensed trade that owns it
- Waterproofing membrane, shower pan and slope before any tile
- Tile, grout, fixtures, vanity, lighting and finishing
Permits, disposal bins and the fixtures themselves are often quoted separately — worth confirming which side of the line they sit on.
Try nowWhat moves the price
- Whether the toilet, tub and vanity stay in their existing positions
- Tub versus walk-in shower, and whether the drain has to move with it
- What is behind the wall — and what has to be replaced once it is open
- Tile size and pattern: large-format and herringbone are slower to set
- Condo access rules, service-lift booking and approved working hours
- Whether a permit is required for the scope
- Fixture and vanity choice, which can move the total more than the labour
Worth asking before you agree
- Which parts are you subbing to a licensed plumber or electrician?
- Which waterproofing system, and can I see it before the tile goes on?
- Does the price assume the fixtures stay where they are?
- What happens to the quote if you open the wall and find galvanised supply?
- Who pulls the permit, if one is needed?
- How many days will the room be out of use, and is there a working washroom?
Three steps
How Taskly works
- 1
Post your task
Say what needs doing and when. Free, two minutes, no account until you accept.
- 2
Compare offers
Verified Taskers send a price and an approach. You see the whole cost up front.
- 3
Choose, then pay
Pick who fits. The money is held and released only when you confirm it’s done.
No lead fees on either side — Taskers don’t pay to make an offer, so you’re not paying for someone’s cost of finding you.
Why Taskly
What you can actually count on
Reviewed before they offer
ID check, phone verification, a real interview and a real photo.
Priced with a method
Ranges come from a versioned, dated rate table — never an invented average.
Built for the GTA
Lift access, month-end crunch and salt season are in the pricing, not surprises.
Pay only when done
The money is held by Taskly and released after you confirm the work.
Questions
Frequently asked
GTA-specific answers to what people actually search for.
How much does a bathroom renovation cost in Toronto?
We do not publish a band for this category yet, and that is deliberate: our pricing engine has rows for cleaning, moving, junk removal, lawn care, plumbing and electrical work, and a bathroom renovation is not one of them. Rather than type a range nobody can derive, the page shows none — post the job and compare the fixed-price offers you actually receive, which is the number that matters.
What makes one bathroom quote three times another?
Almost always the layout. Keeping the toilet, tub and vanity where they are means the drains and vents do not move and the work is finishes; moving any of them means opening the floor, which in most GTA houses is the ceiling of the room below. Tile choice moves the number far less than people expect.
Do I need a permit to renovate a bathroom in Ontario?
It depends on scope. Replacing finishes in the same footprint generally does not; structural changes and new plumbing or electrical work often do, and a condo will have its own approval process on top of the municipal one. Ask who is pulling it — a contractor who has not raised the question has not priced it.
Can one person do the whole job?
Not legally, for all of it. Altering drains or supply lines and adding circuits are licensed trades in Ontario. A general renovator handles demolition, framing, tile, fitting and finishing and subs the rest, which is normal — what matters is that they tell you who is doing it rather than leaving it vague.
How long is the bathroom out of use?
A refresh with no layout change is usually days. A full renovation is more often two to three weeks of working time, and longer if a fixture is back-ordered or an inspection has to be scheduled between stages. In a one-bathroom house that window is the thing to plan around, so ask for it as a sequence rather than a single date.
What is the part I should insist on seeing?
The waterproofing, before the tile covers it. A tiled shower is watertight because of the membrane, the pan slope and how the corners are treated, none of which is visible afterwards. Ask which system is being used, look at it, and take a photo — it is the only opportunity you get.
Free to post
Ready to get it done?
Describe the job and compare fixed-price offers from verified bathroom renovation Taskers across the GTA. You only pay when it’s finished.

